TransCanada Keystone Pipeline, LLC (Keystone) is proposing to construct and operate a crude oil pipeline from Hardistry (Alberta), Canada to Patoka, Illinois (view map of project). The pipeline will be able to deliver 435,000 barrels per day (bpd) of crude oil to existing terminals in Missouri (Salisbury) and Illinois (Wood River and Patoka). The system capacity could be expanded in the future up to 591,000 bpd.

The proposed project includes 1,073 miles of new pipeline in the U.S. (Keystone Mainline). The Keystone Mainline will be comprised of 1,018 miles of 30-inch diameter pipeline from the Canadian border to Wood River, Illinois and 55 miles of 24-inch diameter pipeline from Wood River to Patoka, Illinois. Keystone may also construct an additional pipeline segment from near the Nebraska-Kansas border to Cushing, Oklahoma consisting of 291 miles of 30-inch diameter pipeline.

Because this proposed project will cross into the United States from Canada, a Presidential Permit issued by the U.S. Department of State is required for the project to proceed (see link below to the permit issued on March 11, 2008). This makes the project subject to the National Environmental Policy Act (NEPA), which requires disclosure of potential environmental impacts (beneficial and adverse) and the consideration of possible alternatives.

This website has been created to provide information to the public and to interested parties about the Keystone project.

Permit Authorizing TransCanada Keystone Pipeline, LP ("Keystone") to Construct, Connect, Operate and Maintain Pipeline Facilities at the International Boundary Between the United States and Canada (March 11, 2008)


7/24/2007